Oak Lodge
Highley

1993

Oak Lodge in Highley was the first house I built. I built this single handed.

Main Road
Highley

1995

After Oak Lodge in Highley these two properties also in Highley, were my next venture.

Longville in the Dale
Church Stretton

1996-1997

Longville-in-the-dale was our third development and is situated in-between Church Stretton and Much Wenlock. The development consisted of 1 Number 5 bedroom house and 4 Number 4 bedroom houses. Funding was extremely limited therefore I had to carry out most of the work myself. However, this gave me an excellent understanding of all the aspects of building.


Development Costs
Sales – £984,000

Brynfa Park
Welshpool

1998-2003

Brynfa Park was our first major residential development. Located on a steep slope on the outskirts of Welshpool, Powys. 44 houses were built and ranged from 3 bedroom semi-detached to 4 bedroom detached houses.


Development Costs
Sales – £3,990,000

Oak View
Sarn

2003-2004

Situated between Newtown, Powys and Churchstoke, this residential development consisted of 13 homes. A Sloping site which required digging into the slope which was made up of solid rock.


Development Costs
Sales – £2,460,000

Leighton
Powys

2004

Initially purchased as grassing land. Planning permission was sought and granted for 13 building plots. 10 plots were sold to a local developer and 3 were kept and developed as Pentre Park.


Development Costs
Site Purchase – £300,00
Sales – £1,450,000

Pentre Park
Leighton

2004-2005

Located in the exclusive village of Leighton, Nr Welshpool, Powys. Three homes were built to the highest of specification crafted using outstanding workmanship.


Development Costs
Sales – £1,095,000

Oaklands Park
Newtown

2005-2007

Oakland’s Park is a 41 house residential development, located in Barnfields, on the outskirts of Newtown, Powys. Homes ranged from 2 bed semi-detached to 4 bedroom detached homes.


Development Costs
Sales – £6,278,000

Refail Park
Berriew

2006-2008

Refail Park is an exclusive development of 8 number bespoke homes. Consisting of 5 number 4 bedroomed homes and 3 number 5 bedroomed houses situated in the idyllic hamlet of Refail, Berriew. These homes were built to the highest of specification and all were sold swiftly.


Development Costs
Sales – £3,658,500

Enterprise Centre
Welshpool

2007-2008

This luxury office was completed to the highest of standards in minimal amount of time. This is one of our smaller commercial projects based in the heart of Mid Wales.


Development Costs
Construction costs – £450,000

Dove Meadow
Baschurch

2008-2010

Dove Meadow, Baschurch, situated close to Shrewsbury, is an exclusive development of 5 luxury bespoke properties, prices starting from £665,000 and ranging to £755,000 these homes are to be of higher quality and specification than anything we have ever done before. All properties are now complete and occupied.


Development Costs
Sales – £3,200,000

Bromley Court
Shrewsbury

2007-2011

Bromley Court is a development of 44 stylish 1 and 2 bedroom luxury apartments, situated in the centre of Shrewsbury. Bromley Court was our first development of apartments and this is simply a credit to the team. Being built to our usual high quality this site has been completed and occupied.


Development Costs
Sales – £7,600,000

Phase 1 Brynmor Parc
Newtown

2010

Brynmor Parc is a large residential development of 60 houses. They range from 2 bedroom properties to 5 bedroom detached homes. Having already completed 18 Homes for Wales and West Housing Association. Phase 1 consisted of 25 houses.


Development Costs
Construction Costs – £3,500,000

Dove Court
Baschurch

2013

Dove Court is situated in the much sought after area of Baschurch Near Shrewsbury.The site consists of 10 properties which are a mix of 2, 3 and 4 bedroom homes.


Development Costs
Construction costs – £1,400,000

Phase 2 Brynmor Parc
Newtown

2013

Brynmor Parc is a large residential development of 60 houses. They range from 2 bedroom properties to 5 bedroom detached homes. Phase 2 consisted of a mixture of 3 & 4 bedroom properties.


Development Costs
Construction costs – £4,000,000

34 Church Street
Oswestry

2013-14

Converted from an ex doctors surgery into 3 apartments. This includes a four bedroom penthouse apartment, a three bedroom apartment and a two bedroom apartment.


Development Costs
Construction costs – £500,000

Apartments, 27 Cross Street
Oswestry

2015-2016

Originally derelict stores above our offices. This was converted into six one bedroom town apartments. They are all currently occupied.


Development Costs
Construction costs – £300,000

Phase 3 Brynmor Parc
Newtown

2016

Brynmor Parc is a large residential development of 60 houses. They range from 2 bedroom properties to 5 bedroom detached homes. Having already completed 18 Homes for Wales and West Housing Association. Phase 1 consisted of 25 houses.


Development Costs
Construction costs – £2,000,000

Valley Court
Oswestry

2016-2017

Four two-bedroomed luxury apartments and one dormer bungalow.


Development Costs
Construction costs – £300,000

Paddock Lodge Park
Knockin

2017 - Present

Under Construction
Four holiday homes in the heart of Shropshire, currently under construction. Due to be completed Summer 2018.


Development Costs
Construction costs – £800,000

Homestead
Knockin

2018 - Present

Under Construction
A development of three 4 bedroom family homes in the heart of Shropshire, currently under construction.